Article written

House Update 0

Mar4
Cabinets are in!

Countertops and microwave installed

Our new house is starting to come along, slowly but surely. I stopped by this morning to see how much progress has been made in the past couple days. Mandie went there last night (before going to her sencond job) and said they had delivered the counters, so I had to see for myself. The countertops in the kitchen were installed, with the backsplash and electrical outlets. The microwave was installed, and the dishwasher was delivered but not yet installed. They air conditioning units were also fully installed (including my fancy electronic air cleaners). This morning there were a couple of guys there patching holes in the garage wall, hopefully they’ll make the concrete slab outside the pool bath door. Mandie said there were some people there cleaning windows last night, but the windows I saw were still filthy. That’s to be expected while being in a construction zone.

Welcome back!

This website uses IntenseDebate comments, but they are not currently loaded because either your browser doesn't support JavaScript, or they didn't load fast enough.

subscribe to comments RSS

There are no comments for this post

Please, feel free to post your own comment

* these are required fields

Brian-Foley.net is powered by WordPress and FREEmium Theme. Hosted on DreamHost.
developed by Dariusz Siedlecki and brought to you by FreebiesDock.com