Well I just returned from the first walk through of the house with the builder. We made quite a list, basically a lot of stupid things to be corrected. Some things were left off the house because he read his paper work wrong. For example the pool bath door should have blind inserts, he missed that during ordering. The study should have cabinets and a counter top, he missed that also. They ordered the wrong color hinges and doorknobs, so those all have to be replaced. If they really work at it this week, they should be able to finish it all up. We scheduled our followup walk through for this coming Saturday morning. Hopefully by then it will be all completed.

Now that I’ve seen the wood floors completely uncovered, I kind of regret not doing the wood into the kitchen, they perfectly match the cabinets. Even the builder mentioned that some of the neighbors had “snuck” a peek in our house and commented that they couldn’t believe that we didn’t do the wood into the kitchen. Oh well, it’ll be hard enough keeping them clean with the dogs as it is. I’d also freak out anytime something was spilled in the kitchen, so it’s better off being tile.

If you're new here, you may want to subscribe to my RSS feed. Thanks for visiting!

This website uses IntenseDebate comments, but they are not currently loaded because either your browser doesn't support JavaScript, or they didn't load fast enough.

subscribe to comments RSS

There are no comments for this post

Please, feel free to post your own comment

* these are required fields

Brian-Foley.net is powered by WordPress and FREEmium Theme. Hosted on DreamHost.
developed by Dariusz Siedlecki and brought to you by FreebiesDock.com